Hollow Bar

Cleveland Clinic Cancer Center

  • Cleveland, OH

Cost effective solution: traditional soldier beam and timber lagging walls with multiple levels of tieback anchors.

Download Case Study

Pala Casino

  • San Diego, CA

Three floor addition to preexisting parking structure in the San Diego desert showcased hollow bar system from Nucor Skyline.

Download Case Study

Questa Mine

  • Questa, NM

Hollow-bar anchors used in pre-construction retention wall save time and money for New Mexico mine company.

Download Case Study

West Village Residences

  • New York, NY

Quick, one-step installation of R51N and T76N hollow bar tiebacks were used for this high-profile, luxury condominium in the heart of Greenwich Village.

Download Case Study