Nucor Skyline

Technical Resources

Southeast

Anderson Street Bridge

  • Orlando, FL

One of the first uses of steel H-piles in place of concrete showcased the versatility and ease of use in the local geologic conditions of Florida.

Download Case Study

Cathedral of St. Jude the Apostle

  • St. Petersburg, FL

Threaded bar reinforced concrete foundation for large remodel of iconic cathedral.

Download Case Study

Dadeland

  • Miami, FL

Significant cost and schedule savings found with bottom-up sheet pile solution in a $170 million landmark “village within a city” project

Download Case Study

Elba Island Liquefaction Facility

  • Savannah, Georgia

Precision timing and coordination between partners culminates in successful project

Download Case Study

Empire Lock Reconstruction

  • Empire, Louisiana

Nucor Skyline supplied piling to build the new Empire Lock, located on the Mississippi River.

Download Case Study

Hoffler Place

  • Charleston, SC

Zero lot line property utilizes steel sheet piles for permanent walls in below-grade parking structure.

Download Case Study

I-4 Ultimate Project

  • Orlando, FL

Cramped urban setting and limited space highlights an ideal use for H-piles due to their light weight and short lengths.

Download Case Study

LPV-146 - Chalmette Loop Levee

  • St. Bernard Parish, LA

H-pile addition to existing levee brings emergency bypass to Highway 46 and 100 year elevation levels.

Download Case Study

Manalapan Seawall

  • Palm Beach, FL

Nucor Skyline acted quickly to offer design solutions after Hurricane Sandy damaged existing sea walls on the east coast of Florida, rebuilding with Z-shaped sheet piles to an increased height of 8 feet above the mudline.

Download Case Study

Marion Square Parking Garage

  • Charleston, SC

Underground parking structure with field-welded sheet pile to combat extremely high water-table conditions.

Download Case Study

Nucor DRI

  • St. James Parish, Louisiana

Direct-reduced iron facility needed a loading/unloading dock that could support ocean-going barges on the Mississippi River.

Download Case Study

PortMiami Cruise Terminal

  • Miami, FL

Three new deep water berths in PortMiami will accommodate the new Oasis class ships for continued growth at the Cruise Capital of the World in Miami, FL.

Download Case Study

Red Bug Lake Road Flyover

  • Casselberry, FL

H-pile pier foundations for new flyover in busy central Florida intersection alleviates congestion

Download Case Study

Reedy Creek Parking Garage

  • Lake Buena Vista, FL

ERW and spiralweld pipe made in the USA allowed tight schedules to be met on a parking garage in Central Florida

Download Case Study

SW 1st Street Bridge

  • Miami, Florida

A king pile wall helps to connect Miami neighborhoods with a wider bridge span

Download Case Study

Tampa Port Berth 213 Extension

  • Tampa, FL

A Pipe-Z sheet pile wall was used to increase capacity at the Port of Tampa container terminal.

Download Case Study

Twin Dolphin Marina

  • Bradenton, FL

EPA-friendly Pipe-Z combined wall system allowed marine life to travel in and out of a local Manatee River marina while increasing storm wave protection from 3.5 feet to 5 feet.

Download Case Study

© 2024 Skyline Steel, LLC. All rights reserved
300 Technology Center Way, Suite 450, Rock Hill, SC 29730
Close