Nucor Skyline

Back to Blog List

Share This

Topics/Previous Posts

  • Jul 15, 2021

Lakeside Ranch Stormwater Treatment Area

Nucor Skyline provided an HZ®-M combi-wall for a cofferdam at the South Florida Water Management District’s new S-191 Pump Station. The pump station will be part of a constructed wetland to improve water quality in Lake Okeechobee.

Location: Martin County, FL

Partners:
Owner: South Florida Water Management District;
General Contractor: Kiewit Infrastructure South Co.
Subcontractor: Loren Jock Trucking 

Products: King Piles: HZ®-M 1180M-D Sol. 24; Sheet piles: AZ 26-700 ASTM A572 Gr. 60; Double Channel Walers CH10x20; #18 ASTM A615 Tie Rods (680 tons)

© 2021 Skyline Steel, LLC. All rights reserved
300 Technology Center Way, Suite 450, Rock Hill, SC 29730
Close