Nucor Skyline

Nucor Skyline has developed a groundbreaking solution for below grade parking and basement structures. Below grade construction has numerous design and construction issues that above grade structures do not. That is why building underground is so costly and only considered when all other options are exhausted.

Nucor Skyline is changing the economics of conventional below grade construction by utilizing steel sheet piling as the permanent foundation wall. This innovative use of sheet pile eliminates the need to construct a permanent wall within a shored excavation, which greatly reduces the construction schedule. The reduced schedule equates to significant project savings and a greater return on investment.

Case Study: 1800 Lake Apts

Case Study: 1800 Lake Apts

Top-down steel sheet pile construction for below-grade parking structure in winter conditions. 

Download Case Study

Case Study: Hicksville LIRR Garage

Case Study: Hicksville LIRR Garage

Design guidance from Nucor Skyline aided in the successful completion of two levels of below-grade parking for the LIRR in the historic town of Oyster Bay. 

Download Case Study

Technical Product Manual

Technical Product Manual

Get all the information you need about Nucor Skyline's complete line of steel foundation products. 

Download Product Manual

© 2024 Skyline Steel, LLC. All rights reserved
300 Technology Center Way, Suite 450, Rock Hill, SC 29730
Close