Salt Lake City Airport - Phase 2
Phase 2 of the Airport Redevelopment Program at Salt Lake City’s airport is underway. Ralph L. Wadsworth is using Nucor Skyline H-piles for their deep foundation needs on this project to renovate and earthquake-proof the new airport terminal. (Photo courtesy of the Salt Lake City International Airport)
Location: Salt Lake City, UT
Partners: General Contractor: Joint Venture between Holder Construction/Big-D Construction; Driving Contractor: Ralph. L. Wadsworth Construction
Products: HP 14x117 (10,400 tons), 16” x 0.500 ERW pipe (3,600 tons), and NZ 19 sheet piles (1,650 tons)