The foundation of the new ICE-Technical Operations Building in San Juan Puerto Rico was prepared with the installation of Nucor Skyline’s ERW 14” OD x .0375” pipe piles. Advantix Engineering used a vibratory hammer to install the 345 tons of pipe piles needed to support the new building construction.more