Nucor Skyline

Nucor Skyline Blog

1 postsFilter
  • Dec 01, 2024

Polaris at Totem Lake

A shoring pit was needed for an upcoming multi-story residential building in Kirkland, WA. Malcolm Drilling turned to Nucor Skyline for the 36,000 linear feet of temporary strand anchors that were utilized for stabilizing the earth at the project site.more

© 2025 Skyline Steel, LLC. All rights reserved
300 Technology Center Way, Suite 450, Rock Hill, SC 29730
Close