LFM Northeastern Texas Solar Project
FTC Solar worked with Nucor Skyline to procure the wide flange beams needed for a solar farm in Northeastern Texas. Nucor Skyline rolled the beams in their Nucor Steel Berkeley facility and used a third party for fabricating and galvanizing.
Location: Northeast Texas
Partner: Solar Designer: FTC Solar
Product: W8 wide flange beams – 48,000 (6,100 tons)