Weyerhaeuser is replacing an older creosote wooden dock in their Longview, WA location. Orion Marine used Nucor Skyline 30" x 0.500" spiralweld pipe piles with inside fit cutting shoes attached for the first phase of this project that has a very tight water work window.more