Nucor Skyline

Nucor Skyline Blog

1 postsFilter
  • Jun 01, 2026

Weyerhaeuser Log Export Dock, Phase 1

Weyerhaeuser is replacing an older creosote wooden dock in their Longview, WA location. Orion Marine used Nucor Skyline 30" x 0.500" spiralweld pipe piles with inside fit cutting shoes attached for the first phase of this project that has a very tight water work window.more

© 2026 Skyline Steel, LLC. All rights reserved
300 Technology Center Way, Suite 450, Rock Hill, SC 29730
Close