MTA 207th Street

Spiralweld pipe and PZ 35 sheet pile connectors from Nucor Skyline form a combi-wall for flood mitigation at the 207th Street Rail Yard for the Metropolitan Transportation Authority in New York.
Project: MTA 207th Street
Location: Manhattan, NY
Partner: Walsh Group
Products: Pipe: 54”ODx0.875” spiralweld pipe, 87’ with PZ 35 connectors welded on (6,011 tons)