ALCOSAN North End Facilities River Wall

Nucor Skyline supplied fully fabricated materials to the jobsite for the construction of a 1,200-foot river wall as part of the early-stage construction for the future plant expansion project.

Location: Pittsburgh, PA

Partner: Richard Goettle, Inc.

Products: 60” x 1.000”, 66” x 1.000”, and 72” x 1.000” spiralweld pipe piles with E22 connectors attached, NZ 38 sheet piles, and W36x210 wide flange beam double piles & W40x324 wide flange beam double and single piles (4,250 tons)