Raritan River Bridge Replacement
The Raritan River Bridge Project consists of constructing the bridge approach spans, lift bridge and flanking span piers, and associated land work. The bridge will span approximately 3,100 feet across the Raritan River and will be supported by 84 drilled shafts using 102” OD pipe to support 26 bridge piers.
Location: Perth Amboy & South Amboy, NJ
Partners: Owner: New Jersey Transit; General Contractor: George Harms Construction Co., Inc.;
Construction Manager: AECOM/Mott MacDonald/Dan Brown and Associates; Designer: Hardesty & Hanover/Gannett Fleming
Product: 102” x 1.000” coated pipe (5,800 tons), NZ 14, NZ 19, and NZ 26 sheet piles (3,000 tons), W44x230 wide flange beams (200 tons) and miscellaneous pipe piles 42” to 60” OD for catenary structures.