Nucor Skyline

Back to Blog List

Share This

Topics/Previous Posts

  • Dec 20, 2022

Lake Scranton Dam Rehabilitation

Nucor Skyline’s post-tensioned permanent strand anchors with hot-melt extruded PE sheathing and 19-strand cast anchor heads were used in pre-installed & grouted 5” HDPE corrugated sheathing to improve the stability of an existing masonry dam.

Location: Roaring Brook Township, PA

Partners: Owner: Pennsylvania American Water Company; General Contractor: KC Construction Company; Contractor – Anchor Installation: Brayman Construction Company; Engineers: Gannett Fleming

Products: 23 each 16-strand class I dam tiedowns (123’ to 143’ long) – 48,320 total LF of 0.6” 270 ksi steel strand; 19-strand anchor heads

© 2024 Skyline Steel, LLC. All rights reserved
300 Technology Center Way, Suite 450, Rock Hill, SC 29730
Close