Nucor Skyline

Back to Blog List

Share This

Topics/Previous Posts

  • May 01, 2023

WSDOT I-5 Mercer to SR-520 Portage Bay

Michels Construction worked with Nucor Skyline for the 3,500 tons of permanent drilled shaft casings needed for the second phase of the Rest of the West project in the Seattle area. The casings are being used as the foundation for the new expressway lanes connecting the 520 Bridge to I-5 and for the road widening work being done on the I-5 corridor.

Location: Seattle, WA

Partner: Michels Construction

Products: Permanent drilled shaft casings (3,500 tons) 

© 2024 Skyline Steel, LLC. All rights reserved
300 Technology Center Way, Suite 450, Rock Hill, SC 29730
Close