WSDOT I-405 Widening

From Renton to Bellevue, the new I-405 design-build highway expansion project with the JV Flatiron-Lane will bring two express toll lanes to the area. Nucor Skyline supplied the H-piles, wide flange beams, and spiralweld pipe piles needed for shoring and bridge support on the project.

Location: Bellevue, WA

Partners: Owner: Washington Department of Transportation; General Contractor: JV Flatiron-Lane; Drilling Contractor: Michels

Products: H-pile, wide flange beams, and spiralweld pipe piles – 4,000 tons