Sanibel Island Causeway

The joint venture of Superior Construction and The de Moya Group worked with Nucor Skyline on the emergency repairs needed for the Sanibel Island Causeway. Nucor Skyline worked with several different coating facilities to meet the specifications of the FDOT and get the products ready in a very short time frame.
Location: Sanibel Island, FL
Partners: Owner: Florida Department of Transportation (FDOT); General Contractor: JV Superior Construction and The de Moya Group
Products: NZ 28 and NZ 38 – over 5,700 tons