DHS Technical Operations Building

The foundation of the new ICE-Technical Operations Building in San Juan Puerto Rico was prepared with the installation of Nucor Skyline’s ERW 14” OD x .0375” pipe piles. Advantix Engineering used a vibratory hammer to install the 345 tons of pipe piles needed to support the new building construction.
Location: San Juan, PR
Partners: Owner: U.S. Federal Government - Department of Homeland Security (DHS);
Contractor: Advantix Engineering Corp.
Products: Pipe piles: ERW 14” OD x 0.375”