Sacramento Weir

The USACE chose Granite Construction for the majority of the work on the widening of the Sacramento Weir project for increased flood protection. Nucor Skyline supplied over 6,500 tons of pipe piles, each fitted with APF conical points, for the foundation of the new bridge and fish passage structures that were needed on the project.
Location: Sacramento, CA
Partners: Owner: U.S. Army Corp of Engineers; Contractor: Granite Construction
Products: Pipe piles: 20' x 0.500", 20" x 0.625", and 30" x 1.00"; Accessories: Conical points