Weyerhaeuser Log Export Dock, Phase 1

Weyerhaeuser is replacing an older creosote wooden dock in their Longview, WA location. Orion Marine used Nucor Skyline 30" x 0.500" spiralweld pipe piles with inside fit cutting shoes attached for the first phase of this project that has a very tight water work window.

Location: Longview, WA

Partners: Owner: Weyerhaeuser; Contractor: Orion Marine Contractors, Inc.; Transportation: Dash Point Transportation

Products: Pipe pile: 30" x 0.500" spiralweld pipe piles with inside fit cutting shoes (3,200 tons)