Nucor Skyline

Technical Resources

Pipe

99 Hudson

  • Jersey City, NJ

Deep foundations needed for New Jersey’s tallest building near the Jersey City waterfront.

Download Case Study

Climate Pledge Arena

  • Seattle, Washington

Nucor Skyline spiralweld pipes helped keep the iconic roofline in downtown Seattle safe during the reconstruction of the Climate Pledge Arena

Download Case Study

Colman Dock

  • Seattle, WA

Washington State Ferry terminal gets new upgrade with pipe piles to replace aging timbers.

Download Case Study

Dock 2B Fire Water Intake Structure

  • Marcus Hook, Pennsylvania

Pipe-Z wall constructed to form a cofferdam for a new fire water intake structure.

Download Case Study

Elk Street Bulkhead Wall

  • Buffalo, New York

Construction of a bulkhead wall for environmental containment along the Buffalo River

Download Case Study

Empire Lock Reconstruction

  • Empire, Louisiana

Nucor Skyline supplied piling to build the new Empire Lock, located on the Mississippi River.

Download Case Study

False Creek Levee

  • Contra Costa County, CA

Environmentally friendly sheet pile wall provided minimal disruption to the channel bottom and helped avoid erosion.

Download Case Study

Haines Borough – Portage Cove Harbor Expansion

  • Haines, Alaska

Project to expand the Portage Cove Harbor in Alaska

Download Case Study

I-44 Meramac River Bridge

  • St. Louis, Missouri

Large diameter pipe piles are used as foundation for new bridge deck over the Meramec River.

Download Case Study

I-70 Fulton Street Bridge

  • Wheeling, WV

Prime domestic micropile casing sets the foundation on the I-70 Fulton Street Bridge project

Download Case Study

Kentucky Lake

  • Golden Pond, KY

High seismic zone requires low diameter to thickness ratio pipe piles to meet building requirements in Kentucky.

Download Case Study

Kosciuszko Bridge

  • Brooklyn, NY

New bridge span utilizing ERW pipe piles brings traffic relief to congested Brooklyn

Download Case Study

Lewis & Clark Viaduct

  • Kansas City, KS

Bridge piers for the Lewis and Clark bridge use H-piles for stability

Download Case Study

Logan Airport

  • Boston, MA

Reinforced steel bar cages support light towers for the new runway at Boston Logan International airport

Download Case Study

Newtown Creek Wastewater Treatment Plant

  • Brooklyn, NY

Z-shaped sheet pile and sealant help to provide a watertight seal for a king pile wall at the Newtown Creek Wastewater Treatment Plant in Brooklyn, NY.

Download Case Study

North Shore Tunnel Connection

  • Pittsburgh, PA

The North Shore Tunnel Connector project is a light rail transit (LRT) expansion from downtown Pittsburgh to the north side of town. The new extension line will tunnel bore across the Allegheny River and surface at Heinz Field and PNC Park.

Download Case Study

Nucor DRI

  • St. James Parish, Louisiana

Direct-reduced iron facility needed a loading/unloading dock that could support ocean-going barges on the Mississippi River.

Download Case Study

Petrifond Foundation

  • Montreal, QC

Caissons made of rolled and welded steel were custom fabricated to accommodate the anticipated bedrock profile in an environmentally sensitive area.

Download Case Study

PortMiami Cruise Terminal

  • Miami, FL

Three new deep water berths in PortMiami will accommodate the new Oasis class ships for continued growth at the Cruise Capital of the World in Miami, FL.

Download Case Study

Puerto Caucedo Expansion

  • Puerto Caucedo, DR

Pipe-Z combined wall system formed the foundation for a new jetty in the expansion of Puerto Caucedo in the Dominican Republic.

Download Case Study

Racine Lock & Dam

  • Ohio/West Virginia border

Value-added engineering from Nucor Skyline saves time and money on the Racine hydroelectric plant project.

Download Case Study

Reedy Creek Parking Garage

  • Lake Buena Vista, FL

ERW and spiralweld pipe made in the USA allowed tight schedules to be met on a parking garage in Central Florida

Download Case Study

Revere Dock Wall

  • Detroit, Michigan

Rehabilitation of the Revere Dock Wall in Detroit was done using Nucor Skyline’s H-piles, NZ sheet pile, pipe piles, and connectors

Download Case Study

Rukert Terminal

  • Baltimore, MD

A Pipe-Z sheet pile system was used to replace an outdated, wood piling platform that was sliding away from the land. While more than was necessary at the time, this system was built for long-term durability at the Rukert Terminal in Baltimore, MD.

Download Case Study

Tacoma Trestle Track & Signal

  • Tacoma, WA

An upgrade to an old wooden train trestle brings new routes to the Tacoma, WA area and uses local business to provide steel pipe piles

Download Case Study

Tampa Port Berth 213 Extension

  • Tampa, FL

A Pipe-Z sheet pile wall was used to increase capacity at the Port of Tampa container terminal.

Download Case Study

Twin Dolphin Marina

  • Bradenton, FL

EPA-friendly Pipe-Z combined wall system allowed marine life to travel in and out of a local Manatee River marina while increasing storm wave protection from 3.5 feet to 5 feet.

Download Case Study

Wellsburg Bridge

  • West Virginia/Ohio border

The Wellsburg Bridge, connecting two states across the Ohio River, stands strong on Nucor Skyline’s large diameter drilled shaft casings.

Download Case Study

West Mission Bay Drive Bridge Replacement

  • San Diego, CA

Unique construction method brings two new three lane bridges to growing San Diego area

Download Case Study

© 2024 Skyline Steel, LLC. All rights reserved
300 Technology Center Way, Suite 450, Rock Hill, SC 29730
Close