General Building
Top-down steel sheet pile construction for below-grade parking structure in winter conditions.
Download Case Study
Deep foundations needed for New Jersey’s tallest building near the Jersey City waterfront.
The construction of a new state-of-the-art arena with an aggressive construction timetable.
A design alternative that allowed the client to save time and money.
Micropile were used to secure the foundation of the Breckenridge Gondola which transports passengers to the base of Peak 8 in the Rocky Mountains.
Sheet pile cofferdam helps rebuild flood-ravaged home of the Calgary Zoo.
Threaded bar reinforced concrete foundation for large remodel of iconic cathedral.
Cost effective solution: traditional soldier beam and timber lagging walls with multiple levels of tieback anchors.
Significant cost and schedule savings found with bottom-up sheet pile solution in a $170 million landmark “village within a city” project
An innovative top-down sheet pile construction allowed for building of the superstructure to begin before excavation of parking structure was complete.
Sheet pile walls combine a temporary earth retention system with a permanent building foundation in an extremely tight footprint for two story below-grade parking.
Design guidance from Nucor Skyline aided in the successful completion of two levels of below-grade parking for the LIRR in the historic town of Oyster Bay.
Zero lot line property utilizes steel sheet piles for permanent walls in below-grade parking structure.
Up-down construction using Z-shaped sheet piles and tiebacks proved to be an effective method for a mixed use retail/commercial building with below-grade parking in the Sodo district of Seattle.
First ever installation of a Removable Load distributive compression Anchor (LDCA) system in the Northeastern United States is a cost-effective solution.
Cold formed SKZ sheet piles protect the boardwalk from storm surge at the Point Pleasant Beach in New Jersey.
Time and money savings were realized with the revolutionary sheet pile application for a three levels of below-grade marking in the mixed use development of the John Ross condo in Portland, OR.
Using sealed and painted Z-shaped sheet piles as a finished wall for a below-grade parking garage provides a light and watertight solution.
Threaded bars caisson cages were built and fully assembled at Nucor Skyline’s Camp Hill location to alleviate extremely tight job site.
Top-down construction of three levels of below-grade parking allowed for above-grade construction to happen simultaneously, saving time and money on this high-rise condominium project in downtown Los Angeles.
Underground parking structure with field-welded sheet pile to combat extremely high water-table conditions.
New construction in the downtown Wilmington, DE business corridor breathes life into an ailing community
Three floor addition to preexisting parking structure in the San Diego desert showcased hollow bar system from Nucor Skyline.
Below-grade parking structure using Z-shaped sheet pile saves time and money in México
Provided H-pile for the new foundation of the expanding Pueblo Convention Center
Supplied the foundation piles for Queens Plaza Park which is slated to be the tallest residential mixed used high-rise in Queens, NY
ERW and spiralweld pipe made in the USA allowed tight schedules to be met on a parking garage in Central Florida
Cost-effective, top-down construction of below-grade parking allowed excavation while the building of the superstructure began in the St. Cloud Police Headquarters.
Coated H-Piles make easy work of difficult construction conditions in the Mission Bay District in San Francisco
Deteriorating road conditions at the Intercity Regional Train in Bloomington, MN called for the installation of two permanent steel sheet pile walls with a concrete cap.
The water-tight Larssen interlocks of these Z-shaped sheet piles, plus applied sealant, keep below-grade parking dry in Seattle.
Construction of a Z-shaped sheet pile seawall in a tourism-rich environment saves upwards of $80 million in storm damage for the City of Virginia Beach after only one hurricane season.
Quick, one-step installation of R51N and T76N hollow bar tiebacks were used for this high-profile, luxury condominium in the heart of Greenwich Village.
Supplied piling for sheet pile bulkhead wall to be built for their water shuttle facility